Table HY04. Modifications to the Pomme de Terre River resulting from the construction of Pomme de Terre and Harry S. Truman lakes.
| Stream segment |
PDT-Osage River confluence to top of Truman Lake normal pool (706 ft.) |
| Modification |
Inundation by Harry S. Truman Lake, loss of riverine habitat |
| Distance |
20 miles of the original Pomme de Terre River channel |
| Stream segment |
Top of Harry S. Truman Lake normal pool to Pomme de Terre Dam |
| Modification: |
Pomme de Terre Dam release, alteration of hydrologic regime |
| Distance |
21.6 miles of the original Pomme de Terre River channel |
| Stream segment |
Pomme de Terre Dam to PDT Lake normal flood pool level (839 feet) |
| Modification: |
Inundation by Pomme de Terre Lake, loss of riverine habitat |
| Distance: |
18.3 miles of original Pomme de Terre River channel |
| Stream segment |
Top of PDT Lake normal pool level to maximum pool level (874ft) |
| Modification: |
Inundation by Pomme de Terre Lake during flood events |
| Distance: |
10 miles |